Ningbo Beilun Environmental Protection Solid Waste Disposal Co., LTD

2022-05-13

Phase II Project KE500-105W-1-50

新闻4.jpg

Heat source condition: 140℃ of hot water

Flow rate: 50t / h

Total installed capacity: 500kW

Net power generation: 300kW

Annual power generation: 2.4 million degrees Celsius

Annual benefit: 1.2 million yuan

Annual standard coal saving: 840 tons

Annual CO2 emission reduction: 1995.8 tons



Shanghai GEO: Instrumented Rapid Load Test China . Instrumented Pile Load Test China