Hangzhou Tianziling Waste Treatment Project

2022-05-13

Hangzhou Tianziling Waste Treatment Project 小.png

Heat source conditions: Caterpillar gas turbine discharge flue gas and cylinder liner water converted into 159℃ hot water

Flow rate: 43t / h

Total installed capacity: 710kW

Net power generation: 491kW

Annual power generation: 3.93 million degrees

Annual benefit: 2.75 million yuan

Annual saving of standard coal: 1,375 tons

Annual CO2 emission reduction: 3,267 tons